English

Services and support

The pump is sold only as a start. Selective, design, installation, spare parts, inspection, training - six steps are covered, each with a clear delivery and response time frame.

Service capacity

Six services covering the entire life cycle of the equipment

You can buy a pump or you can deliver the pump room to us as a whole. The service boundaries are different, but the response time frame is the same.

Consulting Engineer
Service flow

One project, four gates.

The four documents will be filed together after the project is completed.

STEP 01
Needs communication and site survey

Media, traffic, stretch, power conditions and installed space are identified; necessary projects are arranged for engineers to see the pumping room and the route.

STEP 02
Selective calculation and programme confirmation

An optional calculator and performance curve with clear work points, power packages, materials and sealing options; a list of layouts and equipment attached to the pumping house project.

STEP 03
Production, set-up and out-of-plant testing

Pump assembly, control cabinet sets, and desk-by-desk test and operation tests, recording current, vibration, noise data delivered with boxes.

STEP 04
Arrivals to debug and transport.

Directs the on-site search, pump test, completes on-site testing of stress, flow, current, and hands-on training of property or equipment managers.

Communication of needs Selecting Production packages Debugment
Four documentsComputation book, drawings, inventory, records
Downloading of data

Product sample and selection data

Sample summaries and selection conditions by series

Yes.Product DirectorySelect the corresponding series, and then look at the "performance parameters" or "draws and samples" on the detailed pages.

Product Selection Manual

The flow of series - upswing - power contrasts, with performance curves and examples of selected types.

Request for documents

Appearance and base map

Install size, position of the foot bolt, direction of import/export and pre-positioning. DWG / PDF

Request for documents

Installation of a user statement

In-situ, piped connections, stop protocols, routine spot checks and common trouble management.

Request for documents

Fire protection suite configuration table

(b) A configuration list of the main pumps, pressure-control devices, control cabinets and pressure-detection interfaces.

Request for documents

Samples, drawings and instructions for installation are available on the telephone line by model.

Service linkages

When consulting for installation, commissioning or on-site service, the equipment type and the project location are provided, confirming the scope and timing of the service.

Contact Tongda.
After the quality and sale,

Let's get this straight, and then we'll sign the contract.

The equipment set can also confirm the quality assurance terms of the components.

Please provide a description of the equipment, its anomalies and photographs of the site, and indicate whether it has been stopped.

The maintenance period can be confirmed in accordance with the instructions for delivery of the equipment.

Frequently asked questions

Select, deliver, sell and question high frequency

If you don't have the answers you want, send them to us, and the engineers will return.

Do you need an on-site survey or a malfunction diagnosis?

The old pump room is retrofitted, frequently overhauled, stress unstable, noise overstretching — clearly describing the phenomenon, and we will first judge whether it is a question of choice or of installation.