How do you judge whether the pump team has energy saving space before the frequency modification?
The time series of flow, pressure, valve state and input power are first collected and then compared with the speed-reducing programme in the same demand.
Compare peak and low load time
If you have a significant amount of time to run in a throttle, you can estimate alternative roll loss using data from typical days or weeks.
Review with existing curves and running records
The benefits are measured using operating hours and measured input power, and are included in the cost of control equipment, commissioning and maintenance.