How do you write about asking for samples, testing documents or qualifications from Tongda?
The project phase, the complete equipment model, the required document usage are clearly stated, and the scope, version and timing of the document are confirmed on a case-by-case basis.
Use different documents at different stages
The programme stage requires a series of samples and profiles. The construction phase requires checking the outer size, basic hole level and connection requirements.
Leave a list of documents confirmed by the parties
Each document may be numbered in the request for quotations, with the words “received” “to be answered” “to be updated”. When model or configuration is adjusted, the curve, drawings and the document version can be re-confirmed against the list to avoid the continued use of the early quotation attachments on site.