English

How does the emergency runoff route affect actual water discharges?

The flow on the pump sign shall be combined with the actual work point.

Draws the line and the line.

Select two possible drainage routes to record the specifications of the hose, the interface and the high water output. Long tube, smaller calibre and additional local resistance change the system curve.

We'll agree on a check-in method.

The equipment is set according to the field command and equipment document, and records of water levels, pressures, running time and drainage during the trial are maintained.

References