What should the buyer agree in advance on when the pump is out of the plant to witness the test?
The identification of the witnesses, the sites, the basis for the determination and the scope of the delivery, in the contract technical documents, will facilitate comparison between the parties under the same conditions.
Use a table to show the test boundary
Identify the type of equipment, the turbo and retrofit configuration, the test media, the number of tables, the work places and projects to be witnessed. Performance, vibration, sealing or other items are specified in the contract and the basis of application; and the instrumentation logs and deviations are agreed upon.
Let the results go back to the delivery of the equipment.
The equipment number, person present and time planned are confirmed before the test, and the test is followed by a check to see if the report corresponds to the equipment. If the configuration adjustment or the project requires a review, the processing requirements, the conditions for the check-up and the time of completion are added to the confirmation record.