What is the focus of storage records when the pump is delayed upon arrival?
When the goods are received and accepted, the conditions for storage are determined according to the equipment documentation and packing requirements.
Record packing and lists first on arrival
Check the whole machine, attachment, information and inscriptions against the boxing sheet. Take pictures of the packaging, port protection and external damage.
Periodic inspection according to equipment files
Confirm the storage environment and requirements for damp protection, corruption protection, port protection, etc..