What about the old pump replacement mapping? First, we'll record the sizes.

The same equipment may also have different interfaces depending on the manner of installation or the history of adaptation.

Record space and connect first

The size, basic hole level, central line to and from the water flange, poaching and height are recorded. The data are marked on photographs or sketches. The surrounding valves, pipe support, lifting paths and the replacement of available space are also recorded.

We need to keep track of the operation.

The data for the new pumps can be checked separately for performance work points and physical connections, and then confirm the feasibility of field plugging, switching or adjusting the base.