English

How can we prepare site data sheets for the underground garages to collect water from the pits?

When selecting the water pump, the water volume, available pit volume, maximum point of discharge, sludge and control fluids need to be understood.

Make a sketch that can see the water.

Record the entry, pit bottom, design extraction level, exit markers and physical length of the tube, distinguishing between storm flow, ground wash and source of equipment drainage. Checks whether high-water levels or pressure-barrel return flow from exports affect drainage and calculates the most unfavourable conditions for designers.

Check drainage equipment and repair space

If you consider a tonda WQ dive sewage pump, you can identify the backup equipment, alarm, lifting and electrical protection requirements based on the use of the site, in accordance with the specific specifications of the pass capacity, cable, coupling or moving installation.

References